50TH STREET
SIDEWALK
|


·
Construction to
build a new sidewalk on
·
There are 3
zones of work for this project.
·
The first two
zones are at each of the corners on
·
The largest
zone of work will take place on the north side of the street.
·
Erosion control
measures and temporary fencing will be the first activities.
·
Asphalt
cutting, excavation, and utility work will then take place near the center of
the street.
·
The temporary
fence will be moved out into the street to create a safe boundary around the
utility work.
·
After the
utility work is complete the temporary fence will be moved back toward the
north as much as possible to allow for 2 lanes of traffic after construction
hours. During construction hours of 8:00
AM to 5:00 PM, the fence will be located in the street allowing for a single
lane of traffic.
·
Traffic signage
and a Sellen flagger will be located appropriately to help direct and assist
with traffic in this area.
·
Excavation and
removal of debris will then take place to ready the area for a new short
retaining wall and sidewalk with curb and gutter along the top of the ravine.
·
Temporary
construction fencing and a large Sellen storage box will be erected on the
north side of
·
The City will
continue to monitor the water levels in the adjacent ravine and maintain the
pumping activities as they have been.
The pumping equipment will be temporarily relocated out of the
construction zone, but will still have access to the ravine as needed.
·
For further details about these activities please contact